DESIGN AND BUILD QUALITY PROJECTS IN CHALLENGING ENVIRONMENTS.

Our Tough Experiences

Experience, Ingenuity, Resilience SBGroup has earned a reputation for never shying away from tough projects.

  • BP Company HQ (4 sites) at Nangarhar Province, Afghanistan.

    This project was unique due to its complex design and a 20M tall water tower, introduced by SBGroup to the client.

  • Company HQ (Austere), Yawez, Shar-e-Bozorg, Badakhshan, Afghanistan.

    The site was extremely remote, procurement and supply for this construction was a big challenge.

  • ANA Presidential Air Wing Relocation SHKIA.

    This project constructed the largest PEB building in Afghanistan, fabricated in Afghanistan during the covid lockdown.

Our Projects

  • Construction of Petrol Pump and LPG Stations several locations in Afghanistan.

    This project consisted of the design and construction of petrol reservoir, LPG storage facility, dispensing units for both gas and oil, office building, storage facility, concrete parking area, steel structure canopy for dispensing units, LPG conversion workshop and all utilities.

  • Construction and repair of NIU SIU Buildings Behind Kabul airport Qasaba, Kabul, Afghanistan

    This project was one of the latest completed projects from SBGroup. this project was the most rapidly implemented project. This project contained of 5 separate buildings renovations. The project consisted of the adapt design, repair of the buildings with complete aspects, construction of the drainage ditches, and connection of water, sewer and electric with main supply and city connections.

  • ANA Rpr Hangar 633 & 3rd SMW Kandahar Air Base,

    The project consisted of two hangars repair work (3rd Special Mission Wings and 633 Hangar) at Kandahar Air base. The hangars were not at the fully functioning level. SBGroup got this opportunity to repair and bring the Hangars to fully functioning phases at a very finest quality.

Company HQ (Austere), Yawez, Shar-e-Bozorg, Badakhshan,

This project was explained as the design and construction of all facilities including utilities. The site was extremely remote, procurement and supply for this construction was a big challenge. The project was located 140 km from Fayezabad. The project was nominated for ANBP units. SBGroup proudly completed the project and delivered the promise to the client.

Fire Departments

In 2011 SBGroup was awarded with 4 consecutive Fire department projects in deferent locations of Afghanistan for Afghan National Police (ANP), the requirement for all the 4 fire departments were same similar they included the design and construction of super structure, sub-Structures, still structures Road network and all the utilities for different number of personnel of ANPFDs.

  • ANP Fire Department Class B, Jalalabad

  • ANP Fire Department Class B, Kunar

  • ANP Fire Department (Class B) Panjshir

  • ANP Fire Department Class B, Feyzabad, Badakshan

  • Uniform Police District HQ Bamyan Afghanistan.

    The project consisted of the design and construction of a new Uniform Police UP District Headquarters for the Afghan National Police (ANP) in Sayghan District, Bamyan Province, Afghanistan. The project was defined as the design, material, labor, and equipment to construct buildings, parking area, utilities, and other infrastructure for a design population of 20 personnel of Afghan National Police (ANP).

hero

DESIGN AND BUILD QUALITY PROJECTS IN CHALLENGING ENVIRONMENTS.

OurToughExperiences

Experience, Ingenuity, Resilience SBGroup has earned a reputation for never shying away from tough projects.

  • BP Company HQ (4 sites) at Nangarhar Province, Afghanistan.

    This project was unique due to its complex design and a 20M tall water tower, introduced by SBGroup to the client.

  • Company HQ (Austere), Yawez, Shar-e-Bozorg, Badakhshan, Afghanistan.

    The site was extremely remote, procurement and supply for this construction was a big challenge.

  • ANA Presidential Air Wing Relocation SHKIA.

    This project constructed the largest PEB building in Afghanistan, fabricated in Afghanistan during the covid lockdown.

Our Projects

  • Construction of Petrol Pump and LPG Stations several locations in Afghanistan.

    This project consisted of the design and construction of petrol reservoir, LPG storage facility, dispensing units for both gas and oil, office building, storage facility, concrete parking area, steel structure canopy for dispensing units, LPG conversion workshop and all utilities.

  • Construction and repair of NIU SIU Buildings Behind Kabul airport Qasaba, Kabul, Afghanistan

    This project was one of the latest completed projects from SBGroup. this project was the most rapidly implemented project. This project contained of 5 separate buildings renovations. The project consisted of the adapt design, repair of the buildings with complete aspects, construction of the drainage ditches, and connection of water, sewer and electric with main supply and city connections.

  • ANA Rpr Hangar 633 & 3rd SMW Kandahar Air Base,

    The project consisted of two hangars repair work (3rd Special Mission Wings and 633 Hangar) at Kandahar Air base. The hangars were not at the fully functioning level. SBGroup got this opportunity to repair and bring the Hangars to fully functioning phases at a very finest quality.

  • ANA Presidential Air Wing Relocation SHKIA.

    The project included the renovation and commissioning of the existing VIP Terminal and the design & construction of a new 2 bays Hangar & Back-shops Facility and a new SOF and all utility connections. It was a tough project for its enormous structure form and security of the stakeholders. This was the first Hangar project designed by SBGroup in Afghanistan and erected successfully without any single.

  • Company HQ (Austere), Yawez, Shar-e-Bozorg, Badakhshan,

    This project was explained as the design and construction of all facilities including utilities. The site was extremely remote, procurement and supply for this construction was a big challenge. The project was located 140 km from Fayezabad. The project was nominated for ANBP units. SBGroup proudly completed the project and delivered the promise to the client.

  • BP Company HQ (Austere), Jarf, Badakhshan

    designed and constructed facilities to support the Afghanistan National Border Police in Badakhshan Province, Afghanistan. The site was extremely remote. SBGroup accepted the challenge and established a supply chain to the project site. There was no access road or bridge to deliver our material and equipment. SBGroup hired boats and barges and accessed the site via Tajikistan, including arranging all diplomatic permissions. We could only supply while the Amu river’s flow was low

  • ANP Fire Department Class B, Jalalabad

  • ANP Fire Department Class B, Kunar

  • ANP Fire Department (Class B) Panjshir

  • ANP Fire Department Class B, Feyzabad, Badakshan

  • Uniform Police District HQ Bamyan Afghanistan.

    The project consisted of the design and construction of a new Uniform Police UP District Headquarters for the Afghan National Police (ANP) in Sayghan District, Bamyan Province, Afghanistan. The project was defined as the design, material, labor, and equipment to construct buildings, parking area, utilities, and other infrastructure for a design population of 20 personnel of Afghan National Police (ANP).